A planned replacement for the Kirikiri Stream bridge on State Highway 26 near Thames is now budgeted at about $65 million, compared with an early estimate of $12 million in 2016.
The proposed work includes a new bridge and improvements to the nearby SH26 and SH25A junction. The existing low, narrow bridge is vulnerable to flood debris building up beneath it, creating disruption risk during heavy rain.
Budget 2026 provided $65 million for the bridge and intersection work, alongside other resilience funding for Coromandel roads. NZ Transport Agency Waka Kotahi says it is reviewing scope to identify a value-for-money approach within available funding.
The sharp difference between initial and current estimates has renewed attention on how major infrastructure costs are forecast. The allocation does not mean every part of the design has been settled or construction completed.
